Project
Marine Gate, Brighton
Client
Brown Construction Solutions
Value
£67,000 over two phases
The Brief
We were engaged for our expertise in diamond drilling and temporary works. Our team completed remedial works to remove corroded beams from a seafront block of flats in Brighton.
Our Solution
Our works included:
- Diamond drilling
- Breaking out around existing beams
- Breaking out floor slabs
- Removal and disposal of existing steel beams
- Supply and installation of new steel beams
- New formwork and reinforcement works
The Result
The corroded structural beams were carefully removed and replaced with new, fully compliant steelwork, restoring the integrity and long-term durability of the building.